Project Application Documents

Volume 1 — Application and Project Overview

Project Application Cover Letter
Application and Project Description
Application
Executive Summary
Project Overview
Project Justification
Appedix 1.1, CBoC Report
Appendix 1.2, Concentric Report
Appendix 1.3, Priddle Report

Volume 2 — Sale and Purchase of Mainline Assets

Section A

Contents
Overview
Regulatory Standards
Terms of Transfer
Effects of Transfer on Mainline Shippers
Natural Gas Supply, Markets and Forecast
System Design for Eastern Mainline Project
Third Party Notification
Public Interest of Asset Transfer

Section B

Contents
Appendices

Volume 3 — Commercial Matters

Contents, Filing Manual Checklist, Glossary
Overview
Transportation Terms and Tolls
Supply and Markets
Financing
Hydraulic Design
Appendices

Volume 4 — Pipeline Design

Section A

Contents, Filing Manual Checklist, Glossary
Overview, General Design and Pipe Specific Information
Typicals and Design Confirmation
Part 1, Geo Hazards Assesment
Part 2, Geo Hazards Assesment
Part 3, Geo Hazards Assesment
Hydrotech Report and HSR Data
AB SK HDD Reports – Class Locations ON East
HDD Reports ON East
HDD Report Riviere Delisle
HDD Report Rigaud and Class Locations QC
Class Locations and HDD Report QC

Section B

Contents
Appendix Vol 4-36 HDD Preliminary Feasibility Review — Québec Segment Rivière l’Assomption
Appendix Vol 4-41 HDD Preliminary Feasibility Review — Québec Segment Rivière Saint-Maurice
Appendix Vol 4-44 HDD Preliminary Feasibility Review — Québec Segment Rivière Jacques Cartier
Appendix Vol 4-46 HDD Preliminary Feasibility Review — Québec Segment Rivière Beaurivage
Appendix Vol 4-49 HDD Preliminary Feasibility Review — Québec Segment Rivière du Sud
Appendix Vol 4-53 HDD Preliminary Feasibility Review — Québec Segment Grande Rivière

Section C

Contents
Appendix Vol 4-59 Class Locations — New Brunswick Segment 3 of 5
Appendix Vol 4-64 HDD Preliminary Feasibility Review — New Brunswick Segment Rivière Verte
Appendix Vol 4-66 HDD Preliminary Feasibility Review — New Brunswick Segment Tobique River
Appendix Vol 4-67 HDD Preliminary Feasibility Review — New Brunswick Segment Coal Creek
Appendix Vol 4-69 HDD Preliminary Feasibility Review — New Brunswick Segment Long Creek
Appendix Vol 4-70 HDD Preliminary Feasibility Review — New Brunswick Segment Kennebecasis River
Appendix Vol 4-73 Class Locations — Montréal Lateral 1 of 6
Appendix Vol 4-79 HDD Preliminary Feasibility Review — Québec Segment Rivière des Milles Îles

Volume 5 — Conversion Design

Contents, Filing Manual Checklist
Pipe Condition Assessment, Gas Facility Isolation, Gas Pipe Integrity
Appendix Vol 5-1 Engineering Assessment
Appendix Vol 5-2 System Schematic
Appendix Vol 5-4 Compressor Station Flow Through Prairies
Appendix Vol 5-11 Compressor Station Realignment Prairies
Appendix Vol 5-15 Station 5 Plan and Profile Drawing
Appendix Vol 5-16 Station 9 Plan and Profile Drawing
Appendix Vol 5-20 Station 30 Plan and Profile Drawing
Appendix Vol 5-23 Mainline Valve 65 Plan and Profile Drawing
Appendix Vol 5-31 Compressor Station 100-3 Switch To Line 100-4
Appendix Vol 5-35 Meter Station Typical Prairies
Appendix Vol 5-38 Typical Drip Assembly Removal Drawing
Appendix Vol 5-39 Preliminary List Gas Launcher and Receiver Assets
Appendix Vol 5-41 New Mainline Valve Proposed Location List
Appendix Vol 5-42 New River Crossing Feasibility Study
Appendix Vol 5-43 Assiniboine River Open Cut Reference Drawing
Appendix Vol 5-44 Madawaska River HDD Feasibility Report
Appendix Vol 5-45 Rideau River HDD Feasibility Report

Volume 6 — Facility Design

 Section A

Contents, Filing Manual Checklist, Glossary
Overview
Pump Stations, General and Site-Specific
Appendix Vol 6-1 to Appendix Vol 6-5 Pump Station Aerial Maps – Alberta Segment
Appendix Vol 6-6 to Appendix Vol 6-24 Pump Station Aerial Maps – Prairies Segment
Appendix Vol 6-25 to Appendix Vol 6-35 Pump Station Aerial Maps – Ontario West Segment
Appendix Vol 6-36 to Appendix Vol 6-47 Pump Station Aerial Maps Northern Ontario Segment
Appendix Vol 6-48 to Appendix Vol 6-53 Pump Station Aerial Maps – North Bay Shortcut
Appendix Vol 6-54 to Appendix Vol 6-55 Pump Station Aerial Maps – Ontario East Segment
Appendix Vol 6-56 to Appendix Vol 6-66 Pump Station Aerial Maps – Québec Segment
Appendix Vol 6-67 to Appendix Vol 6-71 Pump Station Aerial Maps New Brunswick Segment
Appendix Vol 6-72 Legend Sheet: Process Flow Diagrams
Appendix Vol 6-82 Swing Valve Station Plot Plan
Appendix Vol 6-84 Pump Station Aerial Map – Cromer
Appendix Vol 6-85 Cromer Pump Station and Metering/Proving Process Flow Diagram
Appendix Vol 6-88 Burstall Pressure Control Station Plot Plan

Section B

Appendix Vol 6-90 Tank Terminals – General Information – Legend
Appendix Vol 6-94 Moosomin Energy East Tank Terminal Process Flow Diagram
Appendix Vol 6-97 Cacouna Energy East Tank Terminal Process Flow Diagram
Appendix Vol 6-100 Saint John Tank Terminal Process Flow Diagrams
Appendix Vol 6-103 Cacouna Marine Terminal Locations
Appendix Vol 6-104 Cacouna Marine Terminal Plot Plan
Appendix Vol 6-111 Latitude and Longitude of Canaport Energy East Marine Terminal
Appendix Vol 6-112 Canaport Energy East Marine Terminal Plot Plan
Appendix Vol 6-121 Montréal Energy East Delivery Meter Station – Process Flow Diagram
Appendix Vol 6-124 Lévis Energy East Delivery Meter Station Process Flow Diagram

Volume 7 — Construction

Contents, Filing Manual Checklist, Glossary
Overview
Construction, General and Component-Specific
Operations
Marine Operations
Emergency Preparedness and Response

Volume 8 — Application and Project Overview

Section A

Contents, Filing Manual Checklist, Glossary
Land and Land Consultation
Appendix Vol 8-1 Typical Sketches of the Right-of-Way Details
Appendix Vol 8-3 Grant of Right-of-Way – Pipe (Alberta)
Appendix Vol 8-11 Temporary Workspace Agreement – Pipe (Alberta)
Appendix Vol 8-23 Supplemental Agreement Respecting Grant of Right-of-Way (Alberta)
Appendix Vol 8-31 Grant of Right-of-Way – Pipeline Cathodic Protection System (Alberta)
Appendix Vol 8-38 Option to Purchase Agreement – Alberta

Section B

Contents
Appendix Vol 8-48 Lease For Pipeline Installations – Alberta
Appendix Vol 8-56 Access Easement Agreement (Alberta)

Volume 9 — Application and Project Overview

 

Volume 10 — Application and Project Overview

 

Volume 11 — Application and Project Overview

 

Volume 12 — Application and Project Overview